Construction began 2001
Opening date 2005
Construction cost $1.5 billion USD
Owner(s) Energética Barra Grande SA (BAESA)
Dam and spillways
Type of dam Embankment, concrete face rock-fill
Height 185 m (607 ft)
Length 665 m (2,182 ft)
Crest width 14 m (46 ft)
Base width 500 m (1,600 ft)
Impounds Pelotas River
Type of spillway Service, controlled
Reservoir
Creates Barra Grande Reservoir
Surface area 94 km2 (36 sq mi)
Power station
Commission date 2005-2006
Type Yes
Turbines 3 x 236 MW Francis turbines
Installed capacity 708 MW
Website
BAESA

The Barra Grande Hydroelectric Power Plant is a dam and hydroelectric power plant on the Pelotas River near Celso Ramos on the border of Santa Catarina and Rio Grande do Sul, Brazil. The power station has a 708 MW capacity and is supplied with water by a concrete face rock-fill embankment dam, the second tallest dam in Brazil.[1] It is owned and operated by Energética Barra Grande SA (BAESA) and produces a 30% equivalent of the demand in Santa Catarina.[2]

Contents

Background

Construction on the dam began on May 2001 by the consortium BAESA whose stakeholders include Alcoa 42.2%, Companhia Paulista de Força e Luz (CPFL) 25%, Companhia Brasileira de Alumínio (CBA) 15%, Camargo Corrêa Cimentos 9%, and DME Energética 8.8%. On November 1, 2005, the first generator went into operation, the second in February 2006 and the third in May of the same year.[3][4] In September 2005 after construction was complete and the reservoir began to fill, the concrete face on the upstream side of the dam cracked, causing a leak of 1280 liter/s. In June 2007, soil was dumped in the area which reduced the leak to 800 l/s. The dam still remains safe.[5]

Specifications

The Barra Grande Dam is a 665 m (2,182 ft) long and 185 m (607 ft) high concrete face rock-fill embankment dam. At its base, it is 500 m (1,600 ft) wide and 14 m (46 ft) at its crest. The dam impounds a reservoir with a 94 km2 (36 sq mi) surface area which supplies water to three 236 MW Francis turbines in the power station.[1]

Controversy

Construction of the dam required clearing 40 km2 (15 sq mi) of araucaria, a Brazilian pine tree, of which only 1% to 7% of their original forest survives. Other species threatened by the reservoir were the endangered bromeliad Dyckia distachya and Paraná. The environmental controversy require BAESA to extend and acquire new licenses along with spending extra money on programs.[6][7][8]

See also

References

  1. ^ a b "Estruturas" (in Portuguese). BAESA. http://www.baesa.com.br/baesa/categoria.php?&cod_modulo=1&cod_categoria=2. Retrieved 12 September 2010. 
  2. ^ "Barra Grande Hydroelectric Power Plant" (in Portuguese). http://www.baesa.com.br/baesa/categoria.php?&cod_modulo=1&cod_categoria=1. Retrieved 12 September 2010. 
  3. ^ "Barra Grande". Alcoa. http://www.alcoa.com/brazil/en/custom_page/environment_barra_grande.asp. Retrieved 12 September 2010. 
  4. ^ "Hydroelectric Plants in Brazil - Santa Catarina". IndustCards. http://www.industcards.com/hydro-brazil-sc.htm. Retrieved 12 September 2010. 
  5. ^ "Taking a tour of CFRDs". International Water Power & Dam Construction. 06 October 2009. http://www.waterpowermagazine.com/storyprint.asp?sc=2054316. Retrieved 12 September 2010. 
  6. ^ Hirsch, Tim (January 5, 2005). "Push to block Brazil dam project". BBC News. http://news.bbc.co.uk/2/hi/science/nature/4146325.stm. Retrieved 12 September 2010. 
  7. ^ "Barra Grande dam gets operating license". EcoAmericas. June 2005. http://www.ecoamericas.com/en/story.aspx?id=644. Retrieved 12 September 2010. 
  8. ^ Hirsch, Tim (January 12, 2005). "Controversial dam clears hurdle". BBC News. http://news.bbc.co.uk/2/hi/science/nature/4167393.stm. Retrieved 12 September 2010.